Air Heater Installation
Air Heater
Up
Next
Our Seattle Shop fabricated a replacement Air Heater, 26 feet ID by 191 feet overall height, in three sections for the No. 10 Recovery Boiler at Everett, WA. Our field crew worked around the clock to remove the original Air Heater through a hole cut in the roof of the Boiler Building and install the newly fabricated Air Heater Sections.

 