We erected a 375,000 Lb/Hr Riley Power Boiler along with the boiler building and a Research Cottrell Precipitator. Included in the contract was the building steel, foundation, piping, instrumentation, electrical, insulation and refractory. Our field crew performed the erection of the Boiler, Building, Instrumentation, Mechanical Equipment Setting and Piping. Subcontracts included; Crane Service, Electrical, Foundations, Insulation and Refractory.
![]() |
||||||||||||